HANGER 603 – EXTERNAL CORRIDOR & REPAIRS

Grand Forks AFB, North Dakota 58205

  • Date: Nov 2010 – July 2011
  • Client: United States Air Force
  • Project Type: Competitive Bid

About this Project

This competitive bid project included full renovation to the existing Hanger 603 approximately 41,704 sf. This includes demo of the interior full finish area (5,835sf) to accommodate the new floor plan for offices and restroom, constructing an additional 1,110 sf to second floor, with a structural steel and masonry wall. The entire building was upgraded: including the existing wet fire sprinkler system through out the entire building along with the foam fire system in the hanger portion of the building; upgrading the existing HVAC and electrical through out the entire building. Work also included an addition for the Exterior Corridor approximately 120 sf with 8’ foundation walls with footers, and minor maintenance/repair of snow guards and exterior wall paneling damaged from snow.

Address

560 25 Road
Grand Junction, CO 81505

View Our Recent Work